Judah Sullivan
Work

Project · Local-first tooling

Zentext

Project memory for when an AI coding session ends. Zentext stores the work, what was checked, and where to pick up next.

Visual evidence

What survives a session.

Zentext keeps task state, verification and the next action in project memory. These examples describe the shape of that record.

Illustrative Zentext handoff record with a theme switch task, verified work, and a route test as the next action.

01 / Illustration

Record the stopping point

A handoff carries the distinction between work that was checked and work that still needs checking. The example is fictional.

View full size
Illustration of a task revision changing, with an old handoff flagged as stale and a current one ready to continue.

02 / Illustration

Keep the handoff current

A handoff is tied to a task revision. When the task advances, a later session can tell that an older handoff needs refreshing.

View full size Explore Zentext